ABB 2CMA100557R1000 — field checks for EQ A44 energy meters
ABB 2CMA100557R1000 is a representative reference within EQ A44 energy meters. This page is organized around a maintenance decision: identify the installed duty, compare the complete part, then prove the function. Order-code options must be checked against the marked unit and the project record.
Technical identity and parameters
| Technical item | Verified value / selection note |
|---|---|
| Complete designation | 2CMA100557R1000 |
| Product family | EQ A44 energy meters |
| Component role | A44 electricity meter |
| Exact ABB order reference | 2CMA100557R1000 |
| ABB product series | EQ A44 energy meters |
| ABB type | A44 112-100 |
| Function | Electric energy metering |
| Series | ABB EQ A44 meter family |
| Final configuration | Confirm exact nameplate, hardware revision and order options before purchase |
The verified family facts above help identify ABB 2CMA100557R1000. Values that depend on a suffix, installed accessory, approval or application are deliberately left for nameplate and manual confirmation.
02 · Identity match
Compare ABB 2CMA100557R1000 against the physical label, not a shortened family name. Confirm CT arrangement, accuracy class, pulse or communication options. Check the complete suffix, revision and any special options or approvals.
If an ABB 2CMA100557R1000 alternative is proposed, document each difference in supply, terminals, materials, mechanical fit or software. A related listing below is a browsing aid, never automatic interchangeability.
01 · Duty at the installed point
ABB 2CMA100557R1000 is selected to meter the specified low-voltage circuit. Record the equipment tag, actual process or circuit duty and the consequence of loss of function. A component that looks similar may serve a different duty in the same cabinet or process area.
For ABB 2CMA100557R1000, start with the original schematic, loop sheet or bill of materials. This fixes the location and the function before a replacement is evaluated.
04 · Receiving inspection
At receipt, compare ABB 2CMA100557R1000 packaging and marking with the approved order. Inspect seals, housings, terminals, connectors and any supplied accessories. Quarantine damaged or ambiguous stock.
Keep the ABB 2CMA100557R1000 delivery reference and revision with the equipment history. The shared category image on this site is illustrative and is not proof of the shipped variant.
03 · Interface review
Trace every connection to ABB 2CMA100557R1000: power, signal, communication, process and protective earth as applicable. Check the mating equipment and access needed for safe service.
For ABB 2CMA100557R1000, record the limits of the upstream and downstream system. Ratings quoted for a family do not replace the exact installation and derating checks.
05 · Controlled replacement
Install ABB 2CMA100557R1000 only under the plant's isolation, permit and qualification procedure. Preserve the prior wiring and configuration record; install accessories required by the official instructions.
Before energizing ABB 2CMA100557R1000, verify terminal mapping, mounting, grounding and all application-specific clearances. Do not use a visual match to waive these checks.
06 · Functional acceptance
After ABB 2CMA100557R1000 is installed, compare register and wiring with the metering design. Test the connected function through the relevant operating states, not merely a power-on indicator.
Record the ABB 2CMA100557R1000 test conditions and results, including any remaining restriction. A failed or unperformed acceptance step means the equipment is not yet released for service.
07 · Future spare decision
Retain the full ABB 2CMA100557R1000 designation, data sheet revision, configured settings and acceptance result for the next maintenance cycle.
If another ABB 2CMA100557R1000 code is offered later, repeat the identity and interface checks rather than assuming that a common series prefix establishes direct replacement.
Release decision
Approve ABB 2CMA100557R1000 only when its documented identity, installed duty and functional acceptance all agree.
Archive the final ABB 2CMA100557R1000 record so future purchases can be assessed against verified evidence.